Given the F-35’s escalating costs and numerous reliability and performance issues, it is wise to harbor skepticism regarding the results of the DOT&E testing. The answer remains unknown as the DOT&E testing report is not accessible to the general public. Additionally, there are doubts regarding whether the $2 trillion program cost is definitive and if new engine cores will be operational by 2029. It is important to note that the views expressed in this article are the author’s opinions and may not align with those of The Epoch Times.
Source link
Despite 400 Percent Cost Increase and Poor Reliability, F-35 Approved for Increased Production Rate
Leave a comment